Manor Interior Solution’s recent refurbishment project for Graf UK’s toilets.
Toiled Design and Installation.
Graf UK Ltd is a leading supplier of sustainable water management systems in the UK, focusing on preventing flooding, sewage discharge, and rainwater harvesting using 100% recycled materials. They offer stormwater management, wastewater treatment, rainwater harvesting, and garden products and specialise also in rainwater harvesting systems to collect and reuse rainwater for residential and commercial buildings.
With one of their offices located at Regan House, Beaumont Road, Banbury, Graf UK approached us with a requirement to revamp their existing washroom, which was in dire need of replacement.
To meet our client’s expectations, we approached the project as a comprehensive refurbishment plan. The first step was to completely strip out the existing washroom, removing all fixtures and fittings until we reached the bare walls. This allowed us to create a clean canvas for the transformation that was about to take place.
High Quality Products
One of the key aspects of this project was the selection of high-quality products and technology. We understand the importance of durable and long-lasting solutions, especially in high-traffic areas such as toilets. To ensure optimal performance and aesthetics, we carefully chose products from reputable manufacturers.
Design process meeting customer expectation
During the Graf toilets refurbishment project, Manor Interior Solution effectively utilized CAD design to meticulously allocate space for each function. We could carefully consider customer needs, environmental restrictions, and technical requirements. The design process allowed us to explore various layout options, ensuring the optimal placement of toilet cubicles, shower cubicles, sinks, and electric radiators. It also facilitated seamless coordination and collaboration between our team, and the client, enabling us to create a tailored design that perfectly met the project’s objectives. The use of CAD design was instrumental in achieving visually appealing, functional, and bespoke results.
Project Details | |
---|---|
Company name: | Graf UK | Site location: | Banbury | Project time scales: | 4 Weeks | Services provided: |
|
Walls and Floors
We clad all the walls in wipeable materials. This choice not only enhances the overall cleanliness of the washroom but also ensures easy maintenance, promoting hygiene and efficiency. Installed three new toilet cubicles, one shower cubicle with a changing area, two new sinks, and an electric radiator. These additions not only improve functionality but also provide a comfortable and convenient experience.
Ceiling, lighting and furniture
To enhance the overall ambiance, we also fitted a new suspended ceiling, which not only adds a touch of sophistication but also accommodates modern lighting fixtures to create a well-lit space. The flooring received equal attention, with the installation of vinyl flooring in the toilet areas, hallway, and old shower area. This choice ensures durability, easy cleaning, and a cohesive aesthetic throughout the space.
Waste management on site
As with any refurbishment project, waste management is a crucial consideration. We arranged for a skip to be present on-site to collect and dispose of the debris and waste materials, ensuring a clean and organized work environment. Throughout the refurbishment process, the toilet area was temporarily out of bounds to ensure the safety and convenience of all occupants.
Conclusions
At Manor Interior Solution, we pride ourselves on delivering high-quality commercial refurbishments. Our Graf toilets refurbishment project showcases our expertise in transforming outdated spaces into functional and aesthetically pleasing environments. We invite you to explore the images below to witness the remarkable before-and-after results of this project.