Commercial fit out and furniture installation Milton Keynes
Customers’ reason for approaching Manor Interior solutions?
We were approached by UK Exchangers after finding us through our website. They selected us to help with the project as they could see we could help with the design process and key planning. As we offer both a partition screen installation service and a furniture installation service. This made the project easier to manage having one single point of contact.
Key design points
Space was tight within the office with space for x10 workstations required. We proposed a layout that would work with the space available. The client had seen some pictures of similar screens on the internet. We did not have the exact system as an option but we did come to us with a very similar product as a solution. We used a demountable partition system that can incorporate both solid and glass modules.
How the project went?
As this was a working office the project could not have been completed in normal working hours as there was nowhere to move the office staff into on a temporary basis. We proposed to start on a Friday evening at 5pm and start the furniture removal service. With the furniture removed and the materials loaded out for the weekend our guys came in early on the Saturday to get all the partition walls built and the furniture assembled. The electrician was booked in on the Sunday by the client to fit trunking with power and data to the new partition. It was critical that this project went smoothly and no problems arose. The client was constantly updated over the weekend on how everything was progressing. The office was completely operational as planned when the staff turned up Monday morning.
Project Details | |
---|---|
Company name: | Uk Exchanges | Site location: | Onley Milton keynes | Project time scales: | 1 Weekend | Services provided: |
|
Pradeep Bodhani
Microvisk Technologies
Very Professional fit out company which undertook extensive dry walling and decorations for our large commercial space.
The work was done to a high standard, within the quotation provided and in the timescale given by Manor Interiors. Health and Safety was also adhered to in carrying out the work keeping the site clean at all times as we are a Pharmaceutical company. We would use this company again for fit out works.