Project

Commercial fit out peterborough

Mezzanine floor removal cambridgeshire

Customers’ reason for approaching Manor Interior solutions?

Psa in peterborough approached us for a quote on a scheme of internal fit out works within a new industrial unit acquired to expand their business. We created a spec for the partition walls and suspended ceilings advising the client on required fire rating regulations when creating office space above and below an existing mezzanine floor.

How the commercial fit out went?

In order to enclose the edge of the existing mezzanine allowing usable office space to be created we installed a 1 hour fire rated jumbo stud partition wall. The client wanted to be able to look down from the offices on the training area. We proposed an XP partitioning system as the units and glass can be pre ordered to pre fit a desired aperture. As the glass specified to comply with regulations was pyro glass, achieving a 1 hour fire rating. Lead times on this type of glass are 4 weeks. Pre ordering prior to starting the build really helped with completion time scales. The double glazed aluminium xp partition framing was powdercoated in the company colours of royal blue. We also fitted the interior partition walls, suspended ceilings along with commercial decoration works on top of the mezzanine. New doors were fitted throughout. Below the mezzanine we installed a 1 hour fire rated suspended ceiling to comply with building regulations. A double glazed glass partition with blinds was fitted to complete the directors office on the first floor.

 

The new unit in Peterborough was an enjoyable project and Christine was easy to work alongside. We hope to assist PSA as their prefered fit out contractor in the future.

Project Details
Company name: PSA Training
Site location: Peterborough
Project time scales: 4 weeks
Services provided:

  • Office design
  • Partition walls
  • Tape and jointing
  • Painting and decoration
  • Suspended ceiling installation
  • Jumbo partitions
  • Glass partitioning
  • Doors and carpentry

BEFORE
AFTER
Pradeep Bodhani

Pradeep Bodhani

Microvisk Technologies

Very Professional fit out company which undertook extensive dry walling and decorations for our large commercial space.

The work was done to a high standard, within the quotation provided and in the timescale given by Manor Interiors. Health and Safety was also adhered to in carrying out the work keeping the site clean at all times as we are a Pharmaceutical company. We would use this company again for fit out works.