Commercial washroom design Milton Keynes
Customers reason for approaching Manor Interior solutions?
We returned to large global company Nikon optical with regards to a much needed toilet refurbishment. We have worked alongside the facilities manager at Nikon now for a number of years and were happy to offer our expert advice on the pressing matter at hand.
Key design points
We put together a proposal for the most economical while also impacting washroom design. We went over colour schemes and decided to go with a grey colour theme. Removable panels were in a dark grey with lighter flashing and light grey anti slip flooring for added contrast. We decorated in the colour oyster dulux wipeable paint.
Project Details | |
---|---|
Company name: | Nikon Optical uk | Site location: | Milton Keynes Buckinghamshire | Project time scales: | 3.5 weeks | Services provided: |
|
How the project went?
We always create a schedule of works for our washroom designs and we were required to work to these time scales. As the building had no further washroom facilities on site we wanted to get this one handed back over to the client on or before the desired deadline. We did not arrange the temporary toilets on this occasion this is however something we can arrange. The toilets had not been refurbished for at least 25 years so we gutted them back to the shell ready to start anew. We fitted armitage shanks sanitary throughout. The toilets have concealed cisterns with stainless steel push buttons and soft close seats. All sinks and urinals were fitted to IPS paneling making everything fully serviceable. The suspended ceilings were re-fitted along with led lighting, something we always recommend in modern commercial space. Nikon are happy with their washroom design that will last for years to come.
BEFORE
AFTER
Pradeep Bodhani
Microvisk Technologies
Very Professional fit out company which undertook extensive dry walling and decorations for our large commercial space.
The work was done to a high standard, within the quotation provided and in the timescale given by Manor Interiors. Health and Safety was also adhered to in carrying out the work keeping the site clean at all times as we are a Pharmaceutical company. We would use this company again for fit out works.